Flow does it but softlines will push it
I would rather hang myself than hang softlines TBQH
My old (low volume) store tried this and it was a mess. Repacks ended up stacked 3 tall on the line backed up halfway down it and most days ended with the whole unload team back there helping finish break out after the unload was done. They didn't take long to relocate it, lol.I was recently told that we* were going to rearrange some of the bulk steel at the end of the line so SL can do their breakout as repacks reach the end of the line. That's wishful thinking, but if repacks exceed the speed of the breakout TM(s) it'll either A) bottleneck the line or B) they'll be stacking repacks all around them so fast they won't have anytime to actually break them down anyway. Going to be a huge fail.
I was recently told that we* were going to rearrange some of the bulk steel at the end of the line so SL can do their breakout as repacks reach the end of the line. That's wishful thinking, but if repacks exceed the speed of the breakout TM(s) it'll either A) bottleneck the line or B) they'll be stacking repacks all around them so fast they won't have anytime to actually break them down anyway. Going to be a huge fail.
*I use "we", but I am well aware that lately I've owned bulk steel re-profiling and fully expect this to fall on my list from my STL in the next few weeks.