ShitShowFlow
Inbound TL
- Joined
- Apr 15, 2018
- Messages
- 4
I've been the Flow TL for about 2 months at my store. We have the same process as No I in Team. I was able to get fully clean one time when they sent a 789 piece truck. I begin with 5-6 TM doing the unload, with 2 more flow TM for processing SL. I have 3 begin at 6:30, which I use to 2 to push and the other to support the unload. 3 more at 7 that go directly into pushing. We have been very close to getting everything pushed by noon, usually just the repacks for BTS remain then. We have been capitalizing on our SFS team which is usually done picking by 9:30a to finish our trucks, however we are never completely clean in the BR.
On Saturday, I never have a full team just because no one wants to work Saturdays. I was down 7 TM just this last Saturday.
I sat down with my Log ETL today and told him there was just no possible way for my team to meet the 3-4 hours shifts that my TM are assigned. He was understanding that it is ludicrous, but our STL will ride us both even if we get the team out by noon for overspending. I'm about fresh out of ideas on how to be more efficient. I don't believe the new unload is going to be for the better.
On Saturday, I never have a full team just because no one wants to work Saturdays. I was down 7 TM just this last Saturday.
I sat down with my Log ETL today and told him there was just no possible way for my team to meet the 3-4 hours shifts that my TM are assigned. He was understanding that it is ludicrous, but our STL will ride us both even if we get the team out by noon for overspending. I'm about fresh out of ideas on how to be more efficient. I don't believe the new unload is going to be for the better.