- Joined
- Aug 22, 2016
- Messages
- 371
Behind on my store’s remodel. Can’t ever find half the fixtures. All the pogs call for larger base decks and end decks that the contractors’ fx and bom state. It’s a horrible set up.
We’ve got electronics “set” and the new discovery tables with power lines running from the ceiling directly into the center where the light boxes are supposed to go.
And then my store’s dayside signing guy turned overnight remodel team member has this thing about taking signing and playing “guess where I’ve hidden it today so I can be the only one to do the signing.”
We’ve got electronics “set” and the new discovery tables with power lines running from the ceiling directly into the center where the light boxes are supposed to go.
And then my store’s dayside signing guy turned overnight remodel team member has this thing about taking signing and playing “guess where I’ve hidden it today so I can be the only one to do the signing.”