MEGATHREAD Signing Tips, Tricks and Quips (along with howls of despair)

I predict big transitions in babies, OTC, men’s grooming if you have it. Looks like 2026 will be a fun time
 
I predict big transitions in babies, OTC, men’s grooming if you have it. Looks like 2026 will be a fun time

Babies in March and Toys in July are the major "space moves" I've seen so far. Haven't seen anything out of the ordinary for OTC but who knows.
 
I predict big transitions in babies, OTC, men’s grooming if you have it. Looks like 2026 will be a fun time
I hope OTC doesn't have a major transition - the last one wasn't small. And I'm not sure what I think about the possibility of the 64" gondolas going away. I see positives and negatives.
 
Guided POG is fine as a training tool, not as a working tool.

Trying to work thru Hearth & Hand today was a bitch using it. Had items come off one POG but not show up on another until after I had completed the Build part- it scanned like NOP merch until the build was complete. 🤦🏻‍♀️
Certain sets such as Hearth & Hand, Bullseye, Legos, Our Generation...I start the first POG, print my labels, back out of it and do the same for the rest of the POGs. That way no matter what POG I'm working on, when I scan an item, it will tell me which POG it goes to. I just make sure that I'm in whatever POG I'm setting. This works well for when you have items (such as Legos) that are similar and people tend to put anywhere.
 
now that there’s just Saturday left to do those two fresh pogs, I find out we didn’t get enough pushers…. Now I have to make an executive decision on which to do and which to leave half set. It may have to be a mix of the both or one gets tied off and redone later… I love it here
 
now that there’s just Saturday left to do those two fresh pogs, I find out we didn’t get enough pushers…. Now I have to make an executive decision on which to do and which to leave half set. It may have to be a mix of the both or one gets tied off and redone later… I love it here

We identified we didn't have the pushers a week ago. We just set it on the existing shelves and pushers and will address it when they arrive.
 
We identified we didn't have the pushers a week ago. We just set it on the existing shelves and pushers and will address it when they arrive.
That’s probably going to be my choice, they have a lead time of 21 days so it can wait until it comes in.

I never got the time to audit them because my store was to focused on toys and SPLNs because of visits.
 
Hello, is there a metric for ppa’s? For the stores that do them, do you do them for every set as you go or after big transitions?
What’s the point in filling them out besides helping HQ with the info.
 
It reminds me of the sheets that come in the label box. However I just noticed there’s no date printed on those unit price labels
 
Hello, is there a metric for ppa’s? For the stores that do them, do you do them for every set as you go or after big transitions?
What’s the point in filling them out besides helping HQ with the info.

Our store has done maybe 2% of ppas for the last 2 years 😂 nobody says anything.

I feel like the only time they help is when they have multiple stores submitting the same issues otherwise if your just a one off issue they'll just ignore you like your incompetent lol
 
I've been cleaning my store's fixture room and I found a full bin of these labels. Anyone know what they are for? None of the rolls have any numbers or way to identify them on them.

441f79c0-084f-4691-92bb-102133a9d585.jpg
 
Why? Why did they take away the ability to print labels for a POG before tying it?

Why did they take away the ability to view upcoming POGs for a given DPCI? Why do I have to not only tie the POG, but click all the way through the "finalize build" step--thereby dropping a priority fill--before anything, including ISM elements, will show as belonging to that POG?

Is this supposed to deter those of us who "cheat" the guided process by setting our POGs independently and refusing to tie shit until we're good and ready to pull priorities and not a minute sooner?

Is there not a single person at HQ who has ever actually set a POG? Is anyone at HQ within five degrees of separation from someone who has ever actually set a POG?
 
Last edited:
Why? Why did they take away the ability to print labels for a POG before tying it?

Why did they take away the ability to view upcoming POGs for a given DPCI? Why do I have to not only tie the POG, but click all the way through the "finalize build" step--thereby dropping a priority fill--before anything, including ISM elements, will show as belonging to that POG?

Is this supposed to deter those of us who "cheat" the guided process by setting our POGs independently and refusing to tie shit until we're good and ready to pull priorities and not a minute sooner?

Is there not a single person at HQ who has ever actually set a POG? Is anyone at HQ within five degrees of separation from someone who has ever actually set a POG
You can. Theres an option near the bottom that says "POG Details" (or something like that). It opens up the old pog page where you can batch the labels. I did it when printing labels for sidecaps.
 
You can. Theres an option near the bottom that says "POG Details" (or something like that). It opens up the old pog page where you can batch the labels. I did it when printing labels for sidecaps.
This no longer works as of yesterday. You just get a message that says something to the effect of “cannot batch labels until POG is tied.”
 

Users who are viewing this thread

Back
Top