- Joined
- Feb 12, 2014
- Messages
- 38
Oh yeah another thing, she wants to start writing out my workload every day and giving it to her. But these past two days, she hasn't asked for it.
Oh yeah another thing, she wants to start writing out my workload every day and giving it to her. But these past two days, she hasn't asked for it.
I lean more on my plano tl.Tell them to suck it lol. They're technically not your boss. Signing tms are aligned under the pricing TL who was aligned under ETL-SL or ETL-SL/GE or ETL-OPS depending on the store. At least under the old structure. New structure PTL might be your boss. I'm assuming both are under salesfloor now.
Tell them to suck it lol. They're technically not your boss. Signing tms are aligned under the pricing TL who was aligned under ETL-SL or ETL-SL/GE or ETL-OPS depending on the store. At least under the old structure. New structure PTL might be your boss. I'm assuming both are under salesfloor now.
@NOP, what are brand walks and statuses?
So anyone know when is this cse project is back on?
So no rush to finish the CSE project?
Where did you find this info? I want to share it with my signing tm.So anyone know when is this cse project is back on?
It's back on as soon as you receive your "Fix-It Kit" in store mail ETA 2/26/2014. There will be a follow up shipment on 3/7. First shipment has 250 pieces and 350 in the second.
New training video available on workbench on 2/28/2014.
Fix-It Kit is to repair an issue with the CSE graphic panels tearing out at the holes in the bottom hardware channels.
Follow-Up Kits are to address any subsequent issues post-set and we are to hold onto these for future transitions.
The set can be resumed once the Fix-It Kits have arrived in store and using the fix-it parts as needed. There will not be enough pieces for every section of wall, only to repair sections that tear out of the bottom channel.
New completion dates are 4/4/2014 and 4/11/14 if your store had delivery delays due to the weather.
I totally forgot about that cosmetic transition. When is that suppose to happen?
Where did you find this info? I want to share it with my signing tm.
I totally forgot about that cosmetic transition. When is that suppose to happen?
Spreadsheet on Workbench. You type in your store to find out your "target" date (haha). I had to dig around to find it while getting information to prep for it since we've been discussing it for awhile due to the amount of planning involved with this - 22 pallets will be coming in, electrical work will be needed.
There are two groups....The first group is going in March for the transition...everybody else is in April.
Where did you find this info? I want to share it with my signing tm.
On the Signing&Fixtures, Hardlines, and Softlines Message Board - Dated 2/21.
does anyone know the part number for the orange bracket like things that slide on to the prongs atop the retractable signing lance, i have tried one-up etc and can't find anything.. the bracket things that the spider clips fit into.. also, for the new cosmetic trans., is the indie stuff changing shelving, fixtures etc., and if not #'s for shelves or strip holders?? thx
Are you referring to the CSE project deadline or the Cosmetics Transition deadline?
does anyone know the part number for the orange bracket like things that slide on to the prongs atop the retractable signing lance, i have tried one-up etc and can't find anything.. the bracket things that the spider clips fit into.. also, for the new cosmetic trans., is the indie stuff changing shelving, fixtures etc., and if not #'s for shelves or strip holders?? thx
Got the "fix it" kit today. It's a joke. Anyone else get their kits?