How did you guys hang your meat bunker overhead? I got it up but it's not centered. I was at it for an hour.
Did anyone get all their sl shippers? I've only got the fruit of the loom men's and not my Hanes...of course somebody tired the Hanes....rawr.
1 more ornament focal, the Rock tree table and one last box of wrap bins left to do.....Maybe maybe I'll get time to look at all the overheads....
Just before I left, there was mention that I must get to all the endcap compliance signs that should be here.
No idea what they are talking about, and they werent sure what to call them without going back in and finding the email..... Anyone else know?
I think I read about this on redwire, the endcap headers are all changing, a black wraped pallet came in today with the new stuff.
Ugh! A PALLET? Oh and yeah, we are supposed to set ALL of the Christmas in 48 hours starting Sunday at midnight.
AND we have to do it with a smile and no flinching at the sting of the whip....
I hate Christmas.
The way I understand the 48-hours challenge is to have Halloween out and Christmas in by the time the 48 hours expires. Not counting the lights, which set early, we have already set all of gift wrap, are setting, at a minimum, the trees today, and will hopefully start setting the ornaments tomorrow. So, by the time the 48-hour challenge begins, we may only have an aisle or two left in rear seasonal and all of mini. That's not that far-fetched to accomplish IMO.
You should feel lucky to be in a district that allows you to set any of Christmas before Halloween. We are not allowed to do that so cannot begin truly setting until Monday overnight. Many other stores are likely in similar situations as recently Spot is trying to quell guest complaints of getting ahead of ourselves on setting holiday stuff early and instead to focus on the current holiday.
🙄 your receiver does more than chill with vendors and bitch about loading the sweep? Lucky.
I think I read about this on redwire, the endcap headers are all changing, a black wraped pallet came in today with the new stuff.
Ours came today. All I had to do was set up a plan with an exec. Im really happy I dont have to do that!
Finished the Christmas prebuild.
No help this year hanging...
Anyone get a chance to see what the ceiling signing looks like? I saw RS, but nothing else.....
Ours came today. All I had to do was set up a plan with an exec. Im really happy I dont have to do that!
Finished the Christmas prebuild.
No help this year hanging...
Anyone get a chance to see what the ceiling signing looks like? I saw RS, but nothing else.....
I haven't pre built anything. Yesterday I had to support market cause power went out. I would have built, but I'm so over being pushed to pre build so they can use me to set instead. I get no help putting up overheads unless I throw a tantrum, so screw them. They can build wrap bins as they set.
Pmts blitzed the gondola take down abs tossed a focal kit anyway.
Bts I only got scheduled 28.5hrs signing for the 68 hrs required. I pre built everything. Plus set aisles, etc. I don't even think I hit a pat on the head for getting it all done.I tend to only set the POGS that are heavier on signing. Ornament tables, tree tables, and the decorated tree are mine. I do not fill them back. I do prebuild anything else because it saves time the Plano team cannot afford to use on building. When my stuff is set, I ditch them to put up overheads.
It is very frustrating when you have a big signing workload but are also expected to help out Plano on setting. Especially when you know your help can make the difference between them being green or not for the week. But my signing has to come first on my heavier weeks and I can't be the savior for Plano every time they need rescuing. Eff that!
Bts I only got scheduled 28.5hrs signing for the 68 hrs required. I pre built everything. Plus set aisles, etc. I don't even think I hit a pat on the head for getting it all done.
While I got a full forty for this set it is always planned badly. First night she'll want tables done plus shippers but it's only an 8hr shift and pog couldn't build it right if they tried half the time. Plus I need to take down the old stuff or face the stl all over me.
I didn't get Hanes either. Bleh.Did anyone get all their sl shippers? I've only got the fruit of the loom men's and not my Hanes...of course somebody tired the Hanes....rawr.