- Joined
- Nov 3, 2011
- Messages
- 1,385
Like seriously, what were they thinking on that rail? With some trial and error, I was able to get it on securely, but why couldnt they just use the rail for stability, and punch a hole just below it? Sheeeesh, gotta make it difficult.
All I did last night was make sure all the trees were lit and signed, tied down all the displays, all endcaps completely signed, directionals up, category strips....yadda yadda. The little junk that was bugging me. Looks really good now and I dont have a basket full of stuff to remember to do.
I read through the PA instructions.......piece of cake. Hoping to finish all the overheads tonight.
If anyone runs out of hooks, an old trick was to make them out of baling wire. Im hoping not to have to do that, but all I have left are 12" and 24" wire hooks, and the old one up hooks, so its an option.
I didnt read the cling instructions. Does the instructions say Not to use water to install them? No water, no bueno!
All I did last night was make sure all the trees were lit and signed, tied down all the displays, all endcaps completely signed, directionals up, category strips....yadda yadda. The little junk that was bugging me. Looks really good now and I dont have a basket full of stuff to remember to do.
I read through the PA instructions.......piece of cake. Hoping to finish all the overheads tonight.
If anyone runs out of hooks, an old trick was to make them out of baling wire. Im hoping not to have to do that, but all I have left are 12" and 24" wire hooks, and the old one up hooks, so its an option.
I didnt read the cling instructions. Does the instructions say Not to use water to install them? No water, no bueno!