GreasyGary
Presentation/Signing
- Joined
- Nov 9, 2017
- Messages
- 211
"non-pog ism" so basically just overheads/front end signing since everything else has a spot on the floor. The only time I ever see signing worked is when somebody is throwing it away straight from the backroom to make room for the newest stuff.
It's not even front end or overheads from what I can tell. The last 2 weeks I checked it, the hours listed in the addendum under "non pog signing" equal exactly what was in the non pog signing guide. Can't remember if the non-pog guide listed the 2 fixture room hours and the pallet breakdown or if I had to add those to get the total for the week but I do remember it adding up to the addendum's weekly total once I added everything listed in the guide.
Last time I saw anything about a FOS overhead it said that a "GM Expert" was to hang it. Granted, that was before this mythical 12hrs popped up, but still makes me think they're budgeting that elsewhere since the hours for the star thing weren't in the non-pog guide for July.
In other news, after an injury in our deathtrap of a fixture room, I am getting 4 hours of that 12 now. So it's a start. Kinda sad because I had just half-joked to someone 2 weeks ago that an injury is what it was going to take to get them to actually give me the hours to get the room under control. Too bad they're blaming my TL for the state of the fixture room even though he has been begging for time to clean it and for people to stop just throwing crap in there for months now.